St. Paul Avenue Resurfacing & Lane Reduction

Contact us

St. Paul Avenue will be resurfaced between Edgcumbe Road and Cleveland Avenue in Saint Paul in 2022. The project will include removing a driving lane in each direction, adding bike lanes to the road and installing new ADA accessible pedestrian ramps to improve safety conditions for all users.

Land surveying crews will be working in the project area before, during and immediately after construction.

There will be no cost to property owners for this project.

View project on interactive map

Subscribe to 2023 road project updates

Timeline

Paving is complete. Ground-in, high-durability stripes are complete. Turf establishment is ongoing. Site cleanup will last through summer.

The city of Saint Paul is working on Edgcumbe Road from St. Paul to Hampshire avenues.

Traffic impacts

The road is fully open to traffic.

Planned layout

Proposed layout graphic showing one parking lane, one bike lane and one travel lane in each direction with a center median
Preliminary road layout (Layout made with Streetmix / CC BY-SA)